Computer-Aided Civil and Infrastructure Engineering, 1 mars 2011, Volume : 26
The development of an effective strategy for the inspection and monitoring of the nation?s critical bridges has become necessary due to aging, increased...
Infra 2006 - Le Québec en chantier : optimiser les interventions, 1 novembre 2006
This paper presents a comprehensive approach to life cycle cost analysis of reinforced concrete bridges that takes into account all costs incurred by the...
Special Issue of Canadian Journal of Civil Engineering in Honor of M.S. Mirza, 1 juin 2006, Volume : 33, Numéro : June 6
This paper presents a new approach to optimizing the maintenance of concrete bridge decks. This approach combines a stochastic deterioration model and a...
Proceedings of International RILEM Workshop on Life Prediction and Aging Management of Concrete Structures: 16 October 2000, 16 novembre 2000
This paper presents a probabilistic approach to life prediction of concrete highway bridge decks based on Bogdanoff''s cumulative damage model. The condition...
The 2nd Canadian Conference on Effective Design of Structures [Proceedings], 20 mai 2008
This paper evaluates relationships between four parameters that govern the time to corrosion initiation of reinforced concrete in chloride-laden environments '...
Concrete under Severe Conditions: Environment and Loading. Proceedings of the 6th International Conference on Concrete Under Severe Conditions (CONSEC'10), CRC Press, 7 juin 2010, Volume : 2
This paper provides an approach based on the monitoring of life cycle performance of concrete bridges exposed to chlorides, and demonstrates its application in...
3rd Congress of the International Federation for Structural Concrete (FIB) and PCI Convention [Proceedings], 29 mai 2010
The need to upgrade the large number of aging reinforced concrete (RC) structures that are exposed to aggressive environments, such as de-icing salts in cold...
Article de périodique (revue)
Texte intégral en ligne
Filtrer vos résultats
Opération réussie
L’élément a été sauvegardé.
Opération réussie
Cet élément a été retiré.
Erreur
Vous avez dépassé le nombre maximal de 100 résultats sauvegardés.
Erreur
Impossible de sauvegarder l’élément. Veuillez réessayer. Si le problème persiste, il pourrait y avoir un problème avec l’élément.
Erreur
Impossible de supprimer l’article demandé. Veuillez réessayer plus tard.